

Drag the handle to compare before and after
- Location
- Pompano Beach, FL
- Building Type
- Retail
- Roof System
- Flat / Low-Slope
- Category
- Commercial
Project Summary
Weathered modified bitumen torn off and replaced with a new granulated cap-sheet system across the whole center.
Tenants across the center were reporting leaks over stockrooms and ceiling tiles were staining after every storm.
We mapped the roof tenant by tenant and worked in phases — tearing off the old modified bitumen and installing a fresh two-ply system with a granulated cap sheet, new drains, scuppers, and edge metal.
Most of the tear-off happened outside store hours so the center stayed open the entire time.
Services Performed
- Multi-tenant survey and phased work plan
- Tear-off of weathered modified bitumen
- New two-ply modified bitumen with granulated cap sheet
- Drain, scupper, and edge metal replacement
- Night and early-morning work to protect store hours
Planning a Similar Roofing Project
Drainage and flashing are part of the roof system
A similar low-slope project needs an assessment of the deck, existing layers and insulation, together with the routes water takes to drains and scuppers. Leaks beside equipment can come from curb flashing rather than the field membrane. Removing wet material and addressing low areas are different tasks from simply installing a new visible surface.
Questions for an occupied-building proposal
Compare the complete membrane or cap-sheet assembly, attachment, insulation, edge metal and penetration details. In Florida, confirm applicable product approvals and wind design requirements for the property. Agree on protected entrances, equipment access and daily weather-tight boundaries. Keep the roof plan, completion photographs and actual warranty terms so later equipment work can preserve the installed system.



